![](http://scu-bucket-1.oss-us-west-1.aliyuncs.com/uploads/2022/08/泰国EV-1.png?x-oss-process=image%2Fquality,q_50%2Fresize,m_fill,w_1024,h_576)
Country :Thailand
Configuration: Lithium battery system: 460kWh
Power Conversion: 250kW EV fast charger : 240kW
40 feet Container
Solution:
This project used 240kW satellite charger but the power grid was unable to supply that amount of power. We have integrated the BESS system with the charger combines as a whole system which resolved the inefficiency.