SCU’s PV-ESS-EV Charging solution saves costs and increases revenue for Norway plastics company. Contribute to corporate energy conservation, emission reduction, and green transformation.
Learn moreSCU provides an energy storage container for the milk powder factory. It adopts an AC coupling scheme and uses EMS to set the charging and discharging time. It can be combined with the local negative price policy in the Netherlands electricity market and use the peak-valley electricity price difference to make profits and save electricity bills.
Learn moreSCU provides HK Electric with a green mobile battery storage system. This system is powered by batteries, which not only helps it solve power supply problems more easily and conveniently but also avoids air and noise pollution during operation, minimizing the impact on the surrounding environment impact, helping the city become carbon neutral.
Learn moreOur customer is a factory in Ireland. The customer installed a large PV capacity. In order to fully absorb PV, SCU provided the customer with a Grid+PV+Energy Storage DC coupling solution, which not only fully utilized the power generated by PV but also enabled the customer to use stored power during peak power demand periods, reducing power costs.
Learn moreOur German customer wants to install a DC fast EV charger in his factory, but there is no grid power supply. For this reason, we provide the customer with an off-grid EV charging station solution, that is, using a mobility energy storage system to power the charging piles. The energy storage system stores electrical energy in the photovoltaic power station and then goes to the charging station to release the stored energy to the charging pile to provide power for electric vehicles. This innovative move enables charging piles to be powered independently, no longer dependent on the power grid while ensuring the continuity of charging services.
Learn moreSCU developed a PV-ESS-Grid solution for an Italian car wash company, providing a stable power supply. At the same time, by maximizing the use of solar power generation and energy storage and reducing dependence on city power, the car wash company significantly reduced energy costs.
Learn moreTo solve the problem of power shortage, African governments have proposed support for the development of rural electrification off-grid solution projects, utilizing clean energy such as wind and solar energy combined with energy storage systems to achieve uninterrupted power supply.
Learn moreThis is an LPG gas processing plant project. The site is powered by two gas generators, two generators will switch one time every day, and it will take 10-30 minutes during the switch. During the switching period, important loads cannot be powered off, how to do it?
Learn moreLocated in Middle of Thailand, SCU 20ft BESS Container has been fully commissioned in OCT of 2022, it will complement the existing onsite solar power generation and supply electricity to the EGAT Personnel Office to reduce the office’s electricity consumption. The Project requires a reliable, efficient, and low life cycle cost means of generating electrical power.